TaI example texts

From PikkaWiki
(Difference between revisions)
Jump to: navigation, search
(Created page with "Accchester Farm <br /> Cargo Waiting to be Processed: ...")

Revision as of 20:31, 1 January 2013

Accchester Farm

Cargo Waiting to be Processed:
83 tonnes of Fertilizer
0 tonnes of Grain

Production last month:
240 tonnes of Grain (72% transported)
8 items of Livestock (0% transported)

Industry Information:
Fruit of the Earth (Low Livestock production, no Grain required or accepted)
Green Revolution (Increase maximum production, requires Fertiliser)
Animal Husbandry (Basic farming method)

5-Year Plan (Expires 1964):
Change production to Green Revolution (Increase maximum production, requires Fertiliser)
Increase production to 250 tonnes of grain/month.

Future Plans (Begins 1964):
Increase production to 500 tonnes of grain/month.

Assessment:
Industry function is good.
Economic situation is good.
Global economy is good.
Local workforce is plentiful.
No new technology available.


Fassingpool Brickworks

Cargo Waiting to be Processed:
234 tonnes of Clay
704 tonnes of Gravel
55 tonnes of Coal

Production last month:
304 crates of goods (76% transported)

Industry Information:
Electric Kiln (no Coal required or accepted)
Terracotta (processes 4 Clay to 1 Gravel)

5-Year Plan (Expires 1972):
Increase production to 250 crates of goods/month.

Future Plans (Begins 1972):
Change production to Concrete Slab (processes 1 Clay to 1 Gravel)
Increase production to 500 crates of goods/month.

Assessment:
Industry function is excellent.
Economic situation is good (and improving).
Global economy is average.
Local workforce is plentiful.
No new technology available.
Clay processing is inadequate.
Gravel processing is very inadequate.


Fassingpool Steelmill

Cargo Waiting to be Processed:
254 tonnes of Iron Ore
186 tonnes of Coal
0 tonnes of Scrap

Production last month:
115 tonnes of Steel (52% transported)

Industry Information:
Blast Furnace (Basic steelmill)

5-Year Plan (Expires 1954):
Increase production to 100 tonnes of steel/month.

Future Plans (Begins 1954):
Upgrade to Oxygen Furnace (Increase maximum production)
Increase production to 250 tonnes of steel/month.

Assessment:
Industry function is good.
Economic situation is good.
Global economy is good.
Local workforce is plentiful.
New technology available.
Iron Ore processing is inadequate.
Scrap processing is excessive.


Fassingpool Steelmill

Cargo Waiting to be Processed:
254 tonnes of Iron Ore
0 tonnes of Coal
72 tonnes of Scrap

Production last month:
35 tonnes of Steel (52% transported)

Industry Information:
Electric Arc Furnaces (can produce Steel from Scrap alone)

The blast furnaces have run out of coal and shut down.
When coal is available, they will take six months to
restart.

5-Year Plan (Expires 1994):
Increase production to 250 tonnes of steel/month.

Future Plans (Begins 1994):
Decrease production to 100 tonnes of steel/month.

Assessment:
Industry function is poor.
Economic situation is average (and worsening).
Global economy is average.
Local workforce is adequate.
No new technology available.
Iron Ore processing is excessive.
Scrap processing is adequate.

Personal tools