TaI example texts
(Created page with "Accchester Farm <br /> Cargo Waiting to be Processed: ...") |
|||
Line 14: | Line 14: | ||
Animal Husbandry (Basic farming method) <br /> | Animal Husbandry (Basic farming method) <br /> | ||
− | + | Active Plans (1959): <br /> | |
Change production to Green Revolution (Increase maximum production, requires Fertiliser) <br /> | Change production to Green Revolution (Increase maximum production, requires Fertiliser) <br /> | ||
Increase production to 250 tonnes of grain/month. <br /> | Increase production to 250 tonnes of grain/month. <br /> | ||
− | Future Plans ( | + | Future Plans (1964): <br /> |
Increase production to 500 tonnes of grain/month. <br /> | Increase production to 500 tonnes of grain/month. <br /> | ||
Line 42: | Line 42: | ||
Terracotta (processes 4 Clay to 1 Gravel) <br /> | Terracotta (processes 4 Clay to 1 Gravel) <br /> | ||
− | + | Active Plans (1967): <br /> | |
Increase production to 250 crates of goods/month. <br /> | Increase production to 250 crates of goods/month. <br /> | ||
− | Future Plans ( | + | Future Plans (1972): <br /> |
Change production to Concrete Slab (processes 1 Clay to 1 Gravel) <br /> | Change production to Concrete Slab (processes 1 Clay to 1 Gravel) <br /> | ||
Increase production to 500 crates of goods/month. <br /> | Increase production to 500 crates of goods/month. <br /> | ||
Line 71: | Line 71: | ||
Blast Furnace (Basic steelmill) <br /> | Blast Furnace (Basic steelmill) <br /> | ||
− | + | Active Plans (1949): <br /> | |
Increase production to 100 tonnes of steel/month. <br /> | Increase production to 100 tonnes of steel/month. <br /> | ||
− | Future Plans ( | + | Future Plans (1954): <br /> |
Upgrade to Oxygen Furnace (Increase maximum production) <br /> | Upgrade to Oxygen Furnace (Increase maximum production) <br /> | ||
Increase production to 250 tonnes of steel/month. <br /> | Increase production to 250 tonnes of steel/month. <br /> | ||
Line 104: | Line 104: | ||
restart. <br /> | restart. <br /> | ||
− | + | Active Plans (1989): <br /> | |
Increase production to 250 tonnes of steel/month. <br /> | Increase production to 250 tonnes of steel/month. <br /> | ||
− | Future Plans ( | + | Future Plans (1994): <br /> |
Decrease production to 100 tonnes of steel/month. <br /> | Decrease production to 100 tonnes of steel/month. <br /> | ||
Latest revision as of 20:43, 1 January 2013
Accchester Farm
Cargo Waiting to be Processed:
83 tonnes of Fertilizer
0 tonnes of Grain
Production last month:
240 tonnes of Grain (72% transported)
8 items of Livestock (0% transported)
Industry Information:
Fruit of the Earth (Low Livestock production, no Grain required or accepted)
Green Revolution (Increase maximum production, requires Fertiliser)
Animal Husbandry (Basic farming method)
Active Plans (1959):
Change production to Green Revolution (Increase maximum production, requires Fertiliser)
Increase production to 250 tonnes of grain/month.
Future Plans (1964):
Increase production to 500 tonnes of grain/month.
Assessment:
Industry function is good.
Economic situation is good.
Global economy is good.
Local workforce is plentiful.
No new technology available.
Fassingpool Brickworks
Cargo Waiting to be Processed:
234 tonnes of Clay
704 tonnes of Gravel
55 tonnes of Coal
Production last month:
304 crates of goods (76% transported)
Industry Information:
Electric Kiln (no Coal required or accepted)
Terracotta (processes 4 Clay to 1 Gravel)
Active Plans (1967):
Increase production to 250 crates of goods/month.
Future Plans (1972):
Change production to Concrete Slab (processes 1 Clay to 1 Gravel)
Increase production to 500 crates of goods/month.
Assessment:
Industry function is excellent.
Economic situation is good (and improving).
Global economy is average.
Local workforce is plentiful.
No new technology available.
Clay processing is inadequate.
Gravel processing is very inadequate.
Fassingpool Steelmill
Cargo Waiting to be Processed:
254 tonnes of Iron Ore
186 tonnes of Coal
0 tonnes of Scrap
Production last month:
115 tonnes of Steel (52% transported)
Industry Information:
Blast Furnace (Basic steelmill)
Active Plans (1949):
Increase production to 100 tonnes of steel/month.
Future Plans (1954):
Upgrade to Oxygen Furnace (Increase maximum production)
Increase production to 250 tonnes of steel/month.
Assessment:
Industry function is good.
Economic situation is good.
Global economy is good.
Local workforce is plentiful.
New technology available.
Iron Ore processing is inadequate.
Scrap processing is excessive.
Fassingpool Steelmill
Cargo Waiting to be Processed:
254 tonnes of Iron Ore
0 tonnes of Coal
72 tonnes of Scrap
Production last month:
35 tonnes of Steel (52% transported)
Industry Information:
Electric Arc Furnaces (can produce Steel from Scrap alone)
The blast furnaces have run out of coal and shut down.
When coal is available, they will take six months to
restart.
Active Plans (1989):
Increase production to 250 tonnes of steel/month.
Future Plans (1994):
Decrease production to 100 tonnes of steel/month.
Assessment:
Industry function is poor.
Economic situation is average (and worsening).
Global economy is average.
Local workforce is adequate.
No new technology available.
Iron Ore processing is excessive.
Scrap processing is adequate.